Russia Trade Contract with Iran Online — Import & Export of Goods · Контракт.Онлайн
🇮🇷 Islamic Republic of Iran

Russia Trade Contract with Iran

Import and export of goods with Iran — a bilingual EN/RU contract for the bank in 5 minutes. CISG not ratified, settlements in rubles or via third currencies

Choose contract type →
Ready in 5 minutes · DOCX · from 2 990 ₽

Which contract fits working with Iran

Four contract types — for any deal structure with an Iranian partner

Trade specifics with Iran

Key terms to reflect in the contract

CISG not ratified — specify governing law

Iran has not ratified CISG. Iranian commercial law is based on the 1932 Commercial Code (as amended) — specify the governing law explicitly in the contract.

No CISG · specify law

Settlements without SWIFT — in rubles

Iran is disconnected from SWIFT. Settlements are made via SPFS, the Mir system, barter schemes, or through third countries (UAE, Turkey, China). Agree the payment mechanism with your bank in advance.

No SWIFT · rubles/barter

North–South Transport Corridor

The International North–South Transport Corridor (INSTC) links Russia and Iran via the Caspian Sea and rail. Main routes: Astrakhan–Bandar Abbas and Astara–Rasht.

North–South Corridor · logistics

173-FZ: repatriation

The repatriation-of-proceeds requirement applies. If using barter or non-monetary schemes, consult your bank on how to record offsetting obligations.

173-FZ · barter

Questions about trade contracts with Iran

Answers to the most common questions

No. Iran has not ratified CISG. Specify the governing law explicitly (e.g., Russian law or a neutral jurisdiction, with ICAC/TIAC arbitration).
Available options: settlements via SPFS (the Russian equivalent of SWIFT), the Mir system, ruble settlements through Russian banks, barter schemes, or settlements through intermediaries in third countries (UAE, Turkey, China).
Request the company's National ID (شناسه ملی). Verify it via Iraniancompanies.com or through SANA (اطلاع‌رسانی ناشران ایرانی).
Grain and food products, metals, machinery and equipment, oil and gas technologies, electrical equipment.
The North–South Corridor: Astrakhan–Bandar Abbas (sea route across the Caspian) or the rail route via Azerbaijan. Delivery takes 10–20 days to Iranian ports.

Need expert help?

Complex deals or non-standard terms — our specialists work directly with your contract

Pre-signing consultation
  • Russian trade delivery guidance
  • Contract data review and preparation
  • Terms negotiation support
from 5 000 ₽ / hour
Bank & customs contract
  • Contract and goods specification
  • HS code matching and verification
  • Revisions after customs broker review
from 10 000 ₽
Full transaction support
  • Contract, specification, amendments
  • Document revisions during shipment
  • Post-customs and logistics follow-up
from 25 000 ₽

Russia Trade Contract with Iran: Key Features

Iran is a strategic trade partner for Russia. Bilateral trade turnover is actively growing, driven by the development of the North–South Transport Corridor and the shift away from the dollar in mutual settlements.

Iranian company details

In the contract, specify the company's National ID (شناسه ملی), its full name in Farsi and English, its address, and the banking details of the Iranian bank. Verification is available through the SANA portal.

Settlements without SWIFT

Iran is disconnected from the SWIFT system. Settlements are carried out via SPFS, the Mir system, in rubles through Russian banks, or through intermediaries in neutral jurisdictions. Clearly specify the payment mechanism and deadlines in the contract.

CISG and governing law

Iran has not ratified CISG. Iranian commercial law is based on the 1932 Commercial Code (as amended). For arbitration, the ICAC at the Russian Chamber of Commerce and Industry or the Tehran International Arbitration Center (TIAC) is recommended.

North–South Transport Corridor

The International North–South Transport Corridor (INSTC) connects Russian Caspian ports with Iran. The Astrakhan–Bandar Abbas route takes 10–14 days — 2–3 times faster than the sea route via Suez.